SAMANA Resorts

SAMANA Developers
Me'aisem First, off Sheikh Mohammed bin Zayed Road (E311), Dubai Production City (IMPZ), Dubai

Starting from

AED 1,350,882

40 sqm

Area

Sep 2028

Delivery

SAMANA Resorts
5 Photos
Click to view gallery
SAMANA Resorts Gallery 1
SAMANA Resorts Gallery 2
SAMANA Resorts Gallery 3
SAMANA Resorts Gallery 4
Explore More

Property Type

apartment

Payment Plan

Available

Developer

SAMANA Developers

Overview

SAMANA Resorts is an off-plan apartment project by SAMANA Developers in Dubai Production City (IMPZ), Dubai, where every apartment, from the studios up to the two-bedroom units, comes with its own private pool. The DLD registry lists the project with 969 units under number 2895, registered on 9 January 2025 and 5.85% complete in the registry data to 2 October 2026, with completion recorded for 30 May 2028; the developer's own page gives an anticipated handover of Q3 2028. Homes run from studios to two-bedroom apartments, with sizes starting at 428 sq ft.

Homes in SAMANA Resorts

• Five layouts, all with a private pool: studio, one-bedroom, one-bedroom with a store room, one-bedroom with a maid's room, and two-bedroom
• Sizes start at 428 sq ft for the studio; the developer has not published a size for each layout, so ask for the unit plan with the exact area before you reserve
• 969 units registered with the DLD under project 2895; the registry records the start of construction on 1 May 2025
• Smart-home systems in the apartments and POD parking in the building, as listed by the developer
• Floor count, number of towers and the split of units by type are not published by the developer; we confirm these from the registered unit plan before you reserve

What makes SAMANA Resorts different

The private pool is the whole idea. In most Dubai buildings the pool is a shared deck on the podium; here each apartment has its own, which changes how a studio or a one-bedroom is used day to day and how it reads in a rental listing. SAMANA has used the same formula in other buildings in the district, including SAMANA Lake Views, so a buyer can set two projects by the same brand side by side and compare layouts, schedules and views before choosing. The second difference is the payment schedule, which the developer publishes in full on its website: it spreads the balance over several years and keeps going after handover, so the amount paid by the time you receive the keys is lower than under a plan that is settled at handover. Third, the product itself: a studio or one-bedroom with a pool in IMPZ is a smaller commitment than the same idea in a coastal district, which is why these units are usually bought to let.

Amenities

• A private pool in every apartment, listed by the developer as the building's main feature
• A large leisure pool deck and a separate kids' pool
• Sun deck and landscaped green space
• Smart-home systems in every apartment
• POD parking and bicycle parking

Location and access

SAMANA Resorts sits in Dubai Production City (IMPZ), the district off Sheikh Mohammed bin Zayed Road (E311), and is registered with the DLD under Me'aisem First. The developer's drive times are 3–5 minutes to City Centre Me'aisem, 10–15 minutes to Jumeirah Golf Estates, 15–20 minutes to Dubai Marina and JBR, 20–25 minutes to Global Village and Palm Jumeirah, and 25–30 minutes to Dubai Mall and Burj Khalifa. Nurseries and schools within a short drive, as listed on the developer's page, include Kids Kingdom Nursery (3–5 minutes), GEMS United School (10–15 minutes) and Dubai British School (15–20 minutes). There is no metro station within walking distance, so a car is part of daily life here. Our Dubai Production City guide covers the district's buildings, roads and daily services.

Who SAMANA Resorts suits

Buyers who want a small apartment that stands out on the rental market: a studio or one-bedroom with its own pool is easier to describe in a listing than one more unit on a shared podium. Owner-occupiers who work in Production City or on the Jumeirah Golf Estates side and would rather have a pool at home than a long drive to one. Buyers who need a long post-handover schedule rather than a plan that is fully paid when the keys are handed over. It suits less well anyone who wants a walkable, metro-connected district or a large family home; the biggest unit is a two-bedroom and the area is built around the car. For another SAMANA building in the same district, compare SAMANA Lake Views; for the rest of the district's towers, see the Production City guide.

What to check before you buy

• The DLD project number is 2895 and the registered developer is Samana International Real Estate Development L.L.C (developer number 1229), with the escrow account at Dubai Islamic Bank; confirm both on the Dubai REST app before paying a reservation fee, and check that the SPA names this entity, because other SAMANA buildings are registered to different Samana companies
• Completion dates differ by source: the registry records 30 May 2028 and the developer anticipates Q3 2028; ask which date the SPA uses and what the delay clause allows
• The registry showed 5.85% completion in the data to 2 October 2026; ask for the latest RERA inspection percentage and the escrow statement for your unit
• The payment plan runs past handover: with post-dated cheques it is 15% on booking, 1% a month for 42 months, 10% in month 12 and 5% in month 18, then 0.5% a month for 56 months; without post-dated cheques the booking payment is 20% and the final stage runs for 46 months. Ask how the post-handover instalments are secured and what happens to them if you resell
• Ask for the unit plan with the exact area and the pool dimensions; the developer publishes only the minimum size of 428 sq ft
• Ask who maintains the private pools, the owner or the building, and how that is reflected in the service charge, since the answer changes the running cost of a unit with its own pool

Quick facts
• Developer: SAMANA Developers (DLD-registered entity: Samana International Real Estate Development L.L.C, developer number 1229)
• Site: Dubai Production City (IMPZ), registered under Me'aisem First, Dubai
• Registry: project 2895, 969 units, registered 9 January 2025, construction start 1 May 2025, 5.85% complete (data to 2 October 2026)
• Homes: studios to two-bedroom apartments, each with a private pool, from 428 sq ft
• Escrow: Dubai Islamic Bank
• Completion: 30 May 2028 in the registry; the developer anticipates Q3 2028

Amenities

Pools: Private pool in every apartment, a large leisure pool deck and a kids' pool
Family: Kids' pool; Kids Kingdom Nursery 3–5 minutes and GEMS United School 10–15 minutes away, as listed by the developer
Parking: POD parking and bicycle parking
Wellness: Sun deck and landscaped green space
Daily needs: City Centre Me'aisem 3–5 minutes away
Smart living: Smart-home systems in every apartment

Calculate Mortgage Repayments

AED
%
Years
%

AED 4,296

per month

Total Loan Amount:

AED 607,897

Duration

25 Years

Register Your Interest

Get the best offers and exclusive pricing

Payment Plan

With post-dated cheques

15% on booking · 1% monthly for 42 months · 10% in month 12 · 5% in month 18 · 0.5% monthly for 56 months (developer's published plan, 9 October 2026)

Without post-dated cheques

20% on booking · 1% monthly for 42 months · 10% in month 12 · 5% in month 18 · 0.5% monthly for 46 months

Starting from

AED 1,350,882

Quick Facts

DeveloperSAMANA Developers
DeliverySep 2028
Property Typeapartment
Area40 sqm

Sales Team

Property Experts

Contact us for the best deals and free consultation

Interested in This Project?

Contact Us Today

Our team is ready to help you get the best deals and free consultation

Free Consultation
24h Response
Multilingual